# Rover competition rules research: ARCh, ARC, URC, ERC (2027 and 2028) Compiled on 2026-11-19. Verbatim rulebook extractions are in [rulebooks/](rulebooks/README.md). **Confidence key:** - **[Official]** means the published rulebook says it. - **[Predicted]** is my estimate from year-over-year trends. - **[Unverified]** comes from memory or secondary sources, not a rulebook I read. ## 0. Status of the 2027 and 2028 rulebooks | Competition | 2027 rules | 2028 rules | |---|---|---| | ARCh (Adelaide, AU) | **v1.0 official** (14 Aug 2026). Competition is 18–21 Mar 2027. | Not published. Predicted below. | | ARC (Türkiye) | **ARC'27 Manual v.1 official** (15 Nov 2026). v.2 is due 13 Dec 2026. Rules freeze at v.3 on 24 Jan 2027. | Not published. Predicted below. | | URC (MDRS, Utah) | **Official** (the document is undated). Finals are 2–5 Jun 2027. | Not published. Predicted below. | | ERC (Kraków, PL) | **Not published.** In 2026, Rev.1 came out on 20 Feb. Expect 2027 rules around Feb 2027. | Not published. | The ERC 2027 section is therefore a prediction built from the ERC 2026 rules (Rev.3), its appendices, and the ERC pattern of small changes each year. --- ## 1. Cross-competition comparison (2027) | Item | ARCh 2027 | ARC 2027 | URC 2027 | ERC 2026 (basis for 2027) | |---|---|---|---|---| | Mass limit | 60 kg per task, 90 kg total fielded. −10% per kg over. Not allowed to compete above 90 kg. | 60 kg per mission. −5% per kg over, so 0 points at 80 kg or more. Excludes the RSCP module, micro-rover and ground station. | 50 kg per mission, 70 kg total fielded. −5% per kg over. Deployables count. | 75 kg per task. Bonus of 15 pts + 1 pt per kg under 75, up to 30 pts per task. −2 pts per kg over. Drone ≤5 kg. | | Size | Must fit a 1.6×1.6 m lander floor and be ≤1.6 m tall. May fold, but must self-deploy. −50% if it doesn't fit. | Designed for a 1.5×1.5×1.5 m airlock. −30% if it fails the airlock. | 1.2×1.2×1.2 m box at weigh-in. −40% if it doesn't fit. | No envelope rule. Only a low centre of gravity and stability are required. | | Cost cap | AUD 35,000, counting rover and base station at full retail value. | USD 25,000, with a cost report of at least 30 items. | USD 26,000 for all fielded equipment, including drone, EVA suit and C2 station. | None. | | GNSS / GPS | **Prohibited.** Off-board positioning is also banned, and a magnetometer may not be used for positioning. | Allowed. WGS84 coordinates are used. | Allowed and essential (WGS84). | Allowed, but autonomy that uses GNSS earns only 80% of traverse points. Video feed earns 50%. | | Drones / UAVs | **Prohibited.** Micro-rovers are allowed. | Not used. A micro-rover is part of Autonomous and Collaboration. | Rotary-wing, ≤5 kg. Allowed in Delivery and Autonomy. Must be FAA-registered with Remote ID and TRUST certificate. | **Required.** Team-designed (COTS parts allowed; a full-COTS drone is not disqualified but gets no documentation points). Used in the Droning sub-task inside a cage. | | Tethers | Prohibited. | Not addressed. RF links only. | Only between the rover and its own deployables. | Prohibited while operating. A cable is required when moving to the Mars Yard. | | E-stop | COTS red latching button with yellow surround on every independent subsystem. It must isolate the batteries, and a second action is needed to resume. | Red latching button ≥3 cm that cuts all motion. Without it the rover cannot compete. | One red push-button that cuts all power. Mobile deployables need their own. | Red button triggered by an open-hand hit. Movement must stop within 1 s and the batteries must be isolated. | | Status light | Static amber, or a full colour state scheme (White, Blue, Cyan, Green, Yellow, Magenta, Red). | Blinking at 1 Hz. Green = remote, Yellow = auto, Red = disarmed. Visible at 5 m. | Red = autonomous, Blue = teleoperation, Flashing Green = arrived. | Blinking or flashing, visible at 10 m in sun. It must start 5 s before any motion, and autonomy must be signalled differently. | | Radio | UHF CB voice, 900 MHz, 2.4 GHz (channels 1 and 11) and 5 GHz with DFS/TPC. Bluetooth Class 2/3 only. | Any band legal under Turkish BTK rules. No satellite or cellular links. | FCC rules. 900 MHz limited to an 8 MHz sub-band and must be able to switch. 2.4 GHz open. No satellite internet. | EU ISM and amateur bands. 2.4 GHz Wi-Fi limited to 100 mW. Two 40 MHz channels in low 5 GHz and two 30 MHz channels in high 5 GHz. No 915 MHz. LTE allowed. | | Antenna mast | ≤2 m. −1% per cm over. | ≤3 m. | ≤3 m, within 5 m of the C2 station. | Within 20 m of the control station. Rover range up to 100 m. | | Points structure | 4 tasks × 125 + CDR/SAR 100 = 600 | Reports 40, Science 100, Night 100, Autonomous 160, Collaboration 100 = 500 | 4 missions × 100 + SAR 100 = 500 | 3000 in total (see §5) | --- ## 2. ARCh – Australian Rover Challenge 2027 [Official v1.0] **Key dates:** - Registration closes 11 Sep 2026. - CDR due 23 Oct 2026. - SAR and proof-of-life video due 5 Feb 2027. - Cost report due 5 Mar 2027. - Competition 18–21 Mar 2027 at Roseworthy campus, Adelaide. ### Required **Team:** - Students at any level. Graduates may stay for 1 year. - At least 2 members fluent in English. - The base station provides two tables, four chairs and two monitors. Sharing the monitor feed with the live stream is mandatory. - Field team must wear safety glasses. **Rover:** - Must be a stand-alone rover, and the same platform must be used for all tasks. - Must fit the 1.6×1.6×1.6 m lander and drive itself out of its folded state. - Needs at least 4 lifting points marked with the ISO 7000-1368 symbol, and must be carryable up to 200 m with one person per 30 kg. **Safety equipment:** - E-stop on every independent electrical subsystem, plus a status light visible from all sides. - A power logger between the battery and the E-stop, so an E-stop does not erase it. A COTS logger is recommended; a custom display or CSV log is allowed with proof that the data is valid. It feeds the efficiency multiplier. Do not power off during setup. - Cable management is a Go/No-Go check. **Radio:** - UHF CB handheld radios on 476.4250–477.4125 MHz. An amateur licence is recommended. - Use the assigned SSID and assigned channels. Using the wrong channel forces a restart, and repeated strikes cost 50%. **Ground station:** At least 20 m of antenna cable. **Water extraction unit:** - Stand-alone, ≤40×40×40 cm. - Has its own E-stop, light and power logger. - Water must be delivered in an airtight, labelled container. **Weather:** The rover must keep working in moderate rain. A weather intervention costs no points. ### Allowed - Micro-rovers, as long as they fit the total mass and size limits and each has its own E-stop and light. One connected system must leave the gate. - Folding mechanisms. Disassembly is not allowed. - Radio: 900 MHz, 2.4 GHz and 5 GHz under ACMA rules. Bluetooth Class 2/3 at ≤2.5 mW. UWB only with ACMA and judge approval. - Fans, but only to cool electronics. - Electrical heating and cooling in the water unit. - Closed-loop fluids, if declared with an SDS. - Magnetometers, but only for sensing ilmenite. ### Prohibited / restricted **Hardware:** - UAVs. - COTS rover platforms. - Tethers. - Air-breathing systems, including fan-driven condensation. **Navigation:** - GNSS/GPS. - Any off-board positioning. - Magnetometer-based positioning. **Water processing:** - Chemical reagents. - Cryogenics. - Thermal pre-conditioning. - Stored latent energy, such as PCMs, ice, CO₂ cartridges or desiccants. - Loading by hand costs 60%. **Pavers:** Adhesives, meshes, magnets and velcro are not allowed between pavers. **Base station:** No phones. **Limits and penalties:** - Cost above AUD 35k. - Mass over the limit: −10% per kg. - Antenna above 2 m: −1% per cm. - Interventions: −10% each. - Repositioning: −40% on later activities. ### Scoring mechanics - Each task scores 100 points multiplied by the efficiency multiplier, EM = 1 + 0.25·ESF. - ESF = 0.5·mass + 0.25·volume + 0.25·energy. Each term is normalised min–max across all teams. - Penalties are additive percentages. - Minimum task time is 35 min. ### Mission specs 1. **Post-Landing** (100 pts): - Drive down a 20° ramp, circle the lander and report damage (20). - Read 3 supply caches (30). - Complete 6 maintenance jobs: buttons, switches, dials, keyboard and plugs (30). - Connect a propellant hose to the lander using a team-designed connector on a 4×M4 interface on a 10 cm square (10). - Connect a modular garden hose (~12/16 mm) to the plant's connector at 30–100 cm height. The connector must be ≤10 cm³ and no adhesives are allowed (10). 2. **Space Resources** (100 pts): - Prospecting: image 2 ice sites and 2 ilmenite sites (8). - Excavate icy regolith and process it into liquid water (50). Any water earns 30, plus 20 × (mass − particulates) ÷ best team's result. - Presentation with wt% estimates (42). An estimate within 0.5% earns 5 pts, within 2% earns 3, and within 5% earns 2. 3. **Site Preparation** (100 pts): - Leave the lander (5). - Clear rocks into a zone ≤5 m away (30). Rocks range from under 1 kg up to 10 kg, at most 17 cm. - Lay team-built rigid pavers (30). They must cover 1.1 m², lie flat and connected, with gaps ≤1 cm. They are carried in a 25×110×25 cm box or a payload ≤35×120×35 cm. - Map four 10 cm coloured cubes (35). A cube within 300 mm earns 5 pts, within 600 mm earns 2, plus points for map quality. 4. **Excavation & Autonomy** (indoors in the CRATER facility on ExM-1P simulant, about 4×10 m, with AprilTags on the walls): - Starts in an autonomous phase: no touching the controls after the rover first moves (driving, arm or camera pan). Some points are only available in this phase. Calling an intervention ends it, and the task continues teleoperated. Each collision in the autonomous phase costs −10%. - Leave the start (5), reach the excavation zone (15), excavate (15), deposit (15). - Build a berm in a 2×0.7 m zone (45): 15 pts for at least 2000 cm³, plus 30 × volume ÷ best team's volume. - Low dust, measured with a PCD-RCM10-type meter (5). ### Trend 2026 → 2027 (from the official changelog) - Excavation moved indoors and became autonomous. "Excavation & Construction" became "Site Preparation", with mapping replacing excavation. - Minimum task time dropped from 40 to 35 min. - Mass rules standardised to 60 kg per task and 90 kg total. - Antenna-height penalty and weather rule are new. - Organisers state: "Teams should expect an increased emphasis on autonomy over the next few years… autonomous operations in each task." ### ARCh 2028 prediction [Predicted] - **Autonomy in every task.** Expect autonomous sub-objectives with point bonuses in Post-Landing (ramp exit and circling the lander) and Site Preparation (rock clearing and mapping). Space Resources will probably add autonomous digging. This is the most strongly signalled change. - **No GNSS, drones or COTS platforms.** These bans have held for years and fit the lunar theme. Expect AprilTag or fiducial localisation indoors and visual odometry or SLAM outdoors. - **Same mass and size.** Expect 60/90 kg and the 1.6 m lander to stay. The cost cap may rise to about AUD 37–40k in line with inflation. It was 35k in 2027. - **Efficiency multiplier stays,** possibly with more weight on energy. - **Lunar ISRU theme continues,** with tasks rotating among water extraction, berms or construction, maintenance and mapping. Indoor CRATER tasks likely grow from one to two. - **Timeline:** Rules around Aug 2027, CDR Oct, SAR Feb, competition Mar 2028. --- ## 3. ARC – Anatolian Rover Challenge 2027 [Official v.1 – may change in v.2 and v.3] **Key dates:** - Landing Site Proposal due 5 Jan 2027. - Early application by 28 Feb 2027. Reports and late application by 31 Mar 2027. - Finalists announced 20 Apr 2027. - Finals in July 2027 in Türkiye. ARC'26 was held at METU Ankara. **Fees:** - Application: $150 early, $175 late. - Finalist fee: $175. ### Required **Team:** - At least 2 students aged 18+ and at least 1 academic advisor. Each person may join only one team. - Insurance and a waiver. **Qualification:** - Design report (50%) and a public YouTube video of about 6 min, at most 10, with timestamps (50%). - A cost report. - An AI Use Statement if AI tools were used. **Rover:** - E-stop: a red latching button ≥3 cm. - Activity light blinking at 1 Hz. Missing it costs −10% per mission. - Team ID plate. - 4× M5 holes to mount the organiser's RSCP module and remote stop. - Able to push a button. - Approved chemical declaration form. **Tech check:** - RED items, where failing means no missions: E-stop present; rover drives 5 m and turns 360°. - ORANGE items bar the rover from the affected mission. - YELLOW items carry a penalty only. **Safety:** - LiPo and Li-ion batteries in fire-safe bags. - Full PPE in the lab. - MSDS for every chemical. - Antenna cable of at least 10 m. ### Allowed - Any radio band legal in Türkiye (Law 5809, BTK). Mast ≤3 m. - GNSS, using WGS84 coordinates. Geofencing within the 40 m field is encouraged. - Micro-rover. It is required in the Autonomous and RTG tasks and needs its own activity light. - AI tools, if disclosed. - Strong chemicals outside pH 4–12, limited to 10 ml. ### Prohibited / restricted **Limits:** - Mass above 60 kg: −5% per kg. - Cost above USD 25k. **Communications:** No satellite or cellular links. **Autonomous mission:** - Rover antennas must be removed. - Any detected remote control scores −100%. **Safety and lab:** - No pyrotechnics, explosives or flammables. - No heating devices or flammables in the lab. **Integrity:** Fabricated report content is prohibited. **Interventions:** - At most 3 per mission: −15%, −40%, −70%. A 4th ends the mission. An E-stop counts as one. - Damaging field items costs −10%. - Each remote stop over RSCP costs −5% and is not counted as an intervention. Detected remote control in the Autonomous mission scores −100%. ### Mission specs 1. **Science** (100 pts). Score = Landing Site Proposal 5% + Science Report 30% + finals 65%. The finals part has 30 min in the field, 10 min in the lab, a 5 min presentation and 10 min of Q&A. - Take a panorama. - Drill samples at ≥10 cm depth and ≥10 g each, from a team-chosen site and a given site, into sealed containers. - Take onboard measurements. Team-built instruments are preferred. - "Solar conjunction": wait 5 min, or drive autonomously to the second site. - Return to the airlock and hand over the samples. - Photograph the mystery rock. - Landing Site Proposal: at most 3 pages. Excluded sites are Eberswalde, Oxia Planum, Nili Fossae, Solis Planum and Athabasca Valles. 2. **Night** (100 pts, 15 min, after sunset): - Find a UV-fluorescent rock using an onboard UV lamp and photograph it. - Put it in the Sample Analysis Chamber: open the lid, place the sample, close the lid. - Turn on the laser and press the analysis button. - Photograph the display, turn off the laser, and return to the airlock. 3. **Autonomous** (160 pts, including a 10-pt bonus; 30 min on the Moon field): - Commands go only through the organiser's RSC-CM module. It uses RS-232 DB9 female at 115200 8N1, and the RSCP protocol is on GitHub. - Exit the airlock. - Find which of 3 rocks in the crater is magnetic, stop within 2 m of it and send its coordinates. - Climb the hill into a 2 m circle. - Decode a Morse light beacon with the camera. Its bearing earns a 10-pt bonus. - Return to the airlock using ArUco markers. - Pick up the micro-rover autonomously. It must not touch the ground (−10%). - Deploy it within 2 m of the correct lava tube (A, B or C). - The micro-rover follows ArUco markers into the tube, reads a battery-% display, and relays the reading through the main rover. 4. **Collaboration** (100 pts, multi-team, 3–4 h, interventions unpenalised): - Sensor task: - Unplug a USB-A data recorder and carry it to base without dragging it. - Collect partially buried sensors. - Infrastructure task (2 rovers): - Clean a solar panel. - Enter a PIN on an instrument panel. - Replace a damaged pipe with the matching colour. - Tow the fuel tanker to the lander, connect the hose, run the pump and watch the level. - Mount a Yagi antenna on the hill and insert its pin. - RTG task: - Open the access panel. - Hand the RTG to the micro-rover. - Retrieve the new RTG from a piston container. - Close the panel. ### Trend 2023 → 2027 - The mission set has been stable since ARC'25: Science, Night, Autonomous and Collaboration. ARC'24 had different missions and used GPS navigation. - The mass limit has been 60 kg since 2023. - The cost cap went from $20k (2023–25) to $25k (2026–27). - Autonomous dropped from 200 to 160 pts in 2027. - Integration of the main rover and micro-rover is new for 2027. - Fees were flat at $125 early, $150 late and $125 finalist in 2025 and 2026, then rose to $150, $175 and $175 in 2027. ### ARC 2028 prediction [Predicted] - **Same four missions,** with fresh scenarios, plus a Landing Site Proposal step. Expect the 60 kg limit, the 1.5 m airlock and the light, E-stop and M5 RSCP interface to stay. - **Cost cap stays at $25k** or rises to $30k. It has risen once so far, from $20k (2023–25) to $25k (2026). - **Wider micro-rover use** across Collaboration and Autonomous, possibly with a separate micro-rover mass or size limit. - **RSCP-only autonomy continues,** with longer chains of sub-tasks. Likely additions: ArUco or beacon decoding, magnetometer or other sensor detection, and object handover. - **Fees** may stay at the 2027 level or rise by another $25. 2027 was the first increase since 2025. - **Timeline:** v.1 in Nov 2027, v.3 freeze in Jan 2028, finals in July 2028. --- ## 4. URC – University Rover Challenge 2027 [Official] **Key dates:** - Registration 30 Oct 2026. - Preliminary Design Review (PDR) 2 Dec 2026. - System Acceptance Review (SAR) on 5 Mar 2027: written report plus video. The top 36 teams advance. - Communications documentation due 30 Apr 2027. - Science Plan due 21 May 2027. - Expense report due 26 May 2027. Late reports lose 10% per day, and a missing report means disqualification. - Finals 2–5 Jun 2027 at MDRS, Utah. ### Required **Team:** - Students enrolled at least half-time. High-school students and multi-university teams are allowed. - Advisors may give academic advice only and may not be in the C2 station. **Rover:** - Must fit a 1.2 m cube. - ≤50 kg per mission and ≤70 kg in total. - One red E-stop that cuts all power. Mobile deployables need their own E-stop. - Status LED: red, blue, flashing green. **Budget:** USD 26k for all fielded equipment, including shipping and taxes, at full price for donated items. The Director may let sponsorships open to all teams extend the limit. **Communications:** - Antenna within 5 m of C2, with at least 25 m of cable. - 900 MHz links must stay within 8 MHz and be able to switch between the Low, Mid and High sub-bands. **Setup and teardown:** Setup ≤15 min, teardown ≤10 min. **Drone:** - Rotary-wing, ≤5 kg, carrying an inert dummy mass equal to the battery mass. - FAA registration if over 250 g, plus Remote ID and a TRUST certificate. - Below 400 ft, with a visual spotter. - Takes off from a landing pad. ### Allowed - Changing the rover's configuration between missions. - Sub-platforms and mini-rovers, except in Delivery, where only a drone is allowed. - Tethers, but only between the rover and its own deployables. - GNSS. - 2.4 GHz with no restrictions. Ham licences are encouraged. - A drone in Delivery and in Autonomy. In Autonomy it may scout but must land before route-finding. ### Prohibited / restricted **Hardware:** - Air-breathing systems. - Fixed-wing drones. **Communications:** - Satellite internet. - A camera on the antenna for tracking. **Testing:** No testing at MDRS. **Chemicals:** Spillable chemicals. Hazardous chemicals need pre-approval. **Limits and penalties:** - Over the mass limit: −5% per kg. - Not fitting the 1.2 m cube: −40%. - Interventions, including battery swaps: −20% each. **C2 station:** Advisors may not be in it. **Environment to expect:** Up to 37.8 °C, dust, light rain. ### Mission specs (each 100 pts) 1. **Astrobiology** (20–30 min, within 0.5 km of C2): - Investigate at least 2 sites. Each needs a panorama with cardinal directions and scale, a close-up with scale, and GNSS coordinates with elevation and accuracy. - Carry at least 2 life-detection capabilities, at least one of which is a bioassay. - Collect a subsurface sample from ≥10 cm deep, ≥5 g, in a sealed cache that can be removed within 5 min. - A Science Plan and a debrief with judges are required. 2. **Delivery** (2 stages, 30–60 min, up to 1 km, beyond line of sight): - Objects are ≤5 kg and smaller than 40 cm on each side, with grip features ≤7.5 cm in diameter. - Tasks include opening hinged boxes, reading signs and searching. 3. **Equipment Servicing** (30 min, lander up to 100 m away, interactions at 0–1.5 m height): - Put a test tube in a cache and lock it. - Carry the cache (<5 kg; handle ≥10 cm long and ≤5 cm diameter). - Open a drawer and put the cache inside. - Undo a latch on a hinged panel. - Type a 3–6 letter key **autonomously** on a vertical keyboard, with 2 cm ArUco 4x4_50 markers as aids. - Move a key between tubular locks (1 cm ArUco markers). - Connect a 1.5" cam-lock hose and turn a ¼-turn valve. - Operate buttons, switches and knobs. 4. **Autonomy** (new format for 2027, 40 min): - **Astronaut Assistance** (50 pts): - Wear an EVA suit with a camera and microphone (5). - Drive autonomously to a GNSS point within 3 m (5). - "Follow" the astronaut. Following a device command earns 5, a sign 5, voice 10, a beckoning gesture 15. - "Stay" (5). - "Fetch" a rock hammer (10). - "Come" (5). - "Give" (5). - An abort costs −20%. Teleoperation costs −50%. - **Route-finding** (50 pts): - Reach 2 targets in hilly terrain and stop within 1 m of each. - Targets are 3-sided ArUco 4x4_50 posts with 20 cm faces, 0.5–1.5 m high. - One target is on a hill and one is behind it, out of line of sight. - URC will try to provide a DEM of 1 m resolution or better. The area runs from 38.411 N, −110.786 to 38.425 N, −110.768. ### Trend 2024 → 2027 - **Budget:** $22k (2024–25), $24k (2026), $26k (2027). - **Drones:** - 2024: fixed or rotary wing, outside the budget. - 2025: rotary only. - 2026: counted in the budget. - 2027: also allowed in Autonomy. - **Science:** Renamed Astrobiology in 2027. - **Autonomy:** - 2024–26: "Autonomous Navigation", with GNSS points, AR posts, then objects such as a mallet and a water bottle in 2026. - 2027: replaced by human–robot interaction (HRI) with an astronaut, plus route-finding guided by the DEM. - **Mass and size:** 50/70 kg and the 1.2 m cube have been stable for years. ### URC 2028 prediction [Predicted] - **Budget about $28k,** following the +$2k per year pattern. - **Autonomy keeps the HRI theme.** Expect more gestures or voice commands, possibly multi-step instructions or object handover. Expect longer routes out of line of sight using the DEM, and maybe drone-to-rover map handoff now that drones are allowed in Autonomy. - **Autonomous parts in Servicing grow.** Typing was the first; expect more steps assisted by ArUco markers. - **No change** to the 4 missions plus SAR, the 50/70 kg limits, the 1.2 m cube or the drone ≤5 kg. - **Timeline:** Rules around Sep 2027, PDR Dec, SAR early Mar, finals late May or early Jun 2028. --- ## 5. ERC – European Rover Challenge (2026 official as the basis; 2027 and 2028 predicted) ### ERC 2026 rules (Rev.3, 19 Jul 2026), the basis for the predictions **Team and documents:** - No cost cap. The rules do not mention an entry fee [Unverified whether entry is free]. - At least 75% of members must be students or graduates within 2 years of an MSc or PhD. Multi-university teams are allowed. - Up to 20 finalists, including up to 5 wildcards. - Milestones: preliminary report (8 Apr), video ≤10 min (31 May), final report with RF form (26 Jul), Science Planning Report (23 Aug), Droning report, finals 4–6 Sep at AGH Kraków (dates from roverchallenge.eu; the venue is in the rules). - Late penalty: −20% per 24 h. **Required:** - **Rover:** - Stand-alone rover. - ≤75 kg per task. - Red E-stop that is hit with an open hand, stops motion within 1 s and isolates the batteries. - Indicator that blinks, is visible at 10 m, lights up 5 s before motion, and shows autonomy differently. - Autonomous operation may start no sooner than 5 s after the command. - Recommended maximum speed 1 m/s. - **Mission capability:** - Can run tasks lasting up to 60 min. - Works from 0 to 30 °C, in rain, in low light and at night. - Keeps communication at up to 100 m and without line of sight. - Has redundancy in the comms system. - Controlled by wire on the way to the Mars Yard. - **Drone:** - Team-designed (COTS parts allowed; a full COTS drone gets no documentation points). - ≤5 kg. - Emergency button on the controller and auto-landing on link loss. - Must pass a preflight check: telemetry and video, manual override, holding position, landing on demand, failsafes for link, battery and positioning loss, and a geofence. - Pilot must keep line of sight. EU/Polish drone rules apply. - **Radio:** - RF form and RFCC cards. Each mismatch costs −20 pts. - 2.4 GHz SSID must be "ERC_TeamName". - **Other:** A sticker of at most 10×10 cm. At least 5 posts with #ERC2026. **Allowed:** - COTS components. A COTS rover platform only with the jury's approval. - GNSS, at a scoring factor of 0.8. - Placing beacons with the rover during a run. - LTE, 4G and 5G. - PMR446 voice radios. - RC controllers for drones only. - Amateur bands with a CEPT licence: 144–146, 430–440 and 1240–1300 MHz, and 5650–5850 MHz. **Prohibited:** - Tethers. - Analog video, and RC controllers for the rover. - 915 MHz. - 2.4 GHz above 100 mW EIRP, or wider than one 20 MHz channel. - Placing passive or active landmarks yourself outside the start area. - Video feed to the operator during Traverse caps it at 50% of the traverse points, and GNSS at 80%. Autonomy points stay possible if autonomy is shown to the judges. - Drilling with the wheels, and scooping coloured soil out of the drill site (−100 pts). - Any hardware change during a run (−20 pts each). - Talking between the observers and the team (−20 pts). **Tasks and points** (3000 in total): - **Documentation** (400): preliminary report 150, video 100, final report 150. - **Science** (1000): - **Exploration** (300): Regional Geology report for Hellas Planitia, Science Planning Report, and a Mars Yard run with an exploration report (≤3000 characters, ≤3 figures) due within 2.5 h. Unexpected Standing Objects are scored. - **Surface Sampling** (200): a regolith sample of ≥100 g and a rock of ≥150 mm. Both are weighed onboard to 1 g and photographed before and after. - **Deep Sampling** (200): drill to more than 30 cm. Colour layers mark the depth: red 15–20, purple 20–25, blue 25–30, white or yellow >30 cm. Collect ≥100 g and weigh it onboard. - **Astro-Bio** (300): - Calibrate a pH meter. - Pick 1 of 5 sites from the data provided and scan its QR code. - Measure the pH of liquid in a 60×75 mm cup and collect ≤100 ml in a leak-proof sealed container. - Run thin-layer chromatography (TLC) on the sample. - Submit a report of ≤1500 characters within 3 h. - **Navigation** (600): - **Traverse** (300): - Reach 4 waypoints, then a finish point, within 20 min. - Full autonomy without video or GNSS earns 100%. Using GNSS earns 80%, and a video feed earns 50%. - Landmarks are ArUco 5x5 markers (IDs 51–64), 150 mm, on 250×250×310 mm boxes on poles. - **Droning** (300): - Takes place in a 10×10×4 m cage. - Take off, find the landing marker (ArUco ID 102, 15 cm, within 3 m) and land precisely. Repeat 3 times. - Detecting each of 3 probes earns 5 pts per mission, up to 45. - A team-built landing pad that attaches to the rover (≤0.5 m radius) earns 15, plus 15 per landing on it, up to 45. - Vision and decision-making must be built in **MATLAB/Simulink**. - **Maintenance** (300): - Panel 330×450 mm. - Turn the main switch on first. - Set 4 lever switches. - Turn 3 rotary switches. - Insert an IEC320 C14 plug. - Turn on 2 power switches. - Place a plate on the electromagnet. - One switch per move. Doing this autonomously is rewarded. - **Probing** (200): Collect 3 yellow-green aluminium probes. Time multiplier: 100% under 7:30, then 90%, 80% and 70%, and 60% beyond 22:30. - **Presentation** (300): 20 min talk plus 20 min Q&A, in English. - **Mass bonus** (200): Rover 15 pts + 1 pt per kg under 75 kg, for each of 6 runs. Drone 20 pts if ≤5 kg. Rover over 75 kg: −2 pts per kg. ### ERC 2027 prediction [Predicted] ERC changes little from year to year: the five task groups have been stable for several editions, and the revisions are incremental. - **Same structure:** Science (Exploration, Sampling, Astro-Bio), Navigation (Traverse and Droning), Maintenance, Probing and Presentation. 3000 points in total. - **Same limits:** rover 75 kg, drone 5 kg, mass bonus, the E-stop and indicator rules, and the 100 m comms range. - **Drone gets a bigger role.** Droning may move from the cage to the Mars Yard, or the drone may help the rover, for example by mapping or landing on the rover's own pad. The 2026 bonus for a pad attached to the rover hints at this. - **More autonomy points.** The requirements already ask for autonomy in sampling, the full Navigation task and the full Maintenance task. Expect higher scoring weight for autonomous Maintenance and Probing. - **New science site.** 2026 used Hellas Planitia. - **Timeline:** Rules and registration about Feb 2027, preliminary report Apr, video May, final report Jul, finals early Sep 2027 in Kraków. The site lists IAC 2027 as an honorary patron, which might shift the timing or format, but that is speculation. ### ERC 2028 prediction [Predicted] - More of the same: drone and rover cooperating, full autonomy in Navigation and Probing, and possibly a joint MATLAB-sponsored autonomy element. - Mass limits are not expected to change. --- ## 6. Design implications for one rover that can enter several competitions - **Mass:** URC's 50 kg per mission is the strictest. A rover of about 45 kg fits all four, and earns about 45 pts per run toward ERC's mass bonus. - **Size:** URC's 1.2 m cube is the strictest. It also fits ARC's 1.5 m airlock and ARCh's 1.6 m lander. - **Navigation:** Build a localisation stack that does not depend on GNSS, using visual odometry or SLAM with ArUco/AprilTag fiducials. ARCh bans GNSS and ERC pays more without it. Treat GNSS as a plug-in for URC and ARC. - **Fiducials:** All four use them. ARCh uses AprilTags, ARC ArUco, URC ArUco 4x4_50, and ERC ArUco 5x5. - **Status light:** A multi-colour, programmable, blinking light can be configured to meet all four schemes. - **E-stop:** A latching red mushroom button that isolates the battery satisfies all four. ARCh also asks for a yellow surround and an E-stop on each subsystem. - **Arm and manipulation:** All four have panels with switches and plugs. ARC and URC add hoses, keyboards and knobs. ERC needs an IEC C14 plug and an electromagnet plate. - **Science payload:** Drill to ≥10 cm (URC, ARC) or 30 cm (ERC), weigh samples onboard (ERC), carry a bioassay (URC), and do pH and TLC work (ERC). - **Radio:** Pick radios that can be reconfigured: 900 MHz sub-band switching (URC), 2.4 GHz at 100 mW (ERC), DFS on 5 GHz (ARCh), and no 915 MHz in the EU. - **Drone:** A rotary drone ≤5 kg covers URC and ERC. It is useless at ARCh, where drones are banned. --- ## Sources - ARCh 2027 rules: https://adelaide.edu.au/content/dam/adelaideuniversity/documents/about/news-and-events/events/2027/australian-rover-challenge/arch-rules-and-regulations.pdf.coredownload.pdf. The CDR, SAR and cost-report guidelines are in the same folder. - ARC'27 Manual v.1: https://www.anatolianrover.space/_files/ugd/6b54d5_3207696afbad4058a33c3dd1782ea0c6.pdf. Earlier manuals are listed in [rulebooks/README.md](rulebooks/README.md). - URC 2027 rules: https://urc.marssociety.org/home/requirements-guidelines, which links to Drive file 1rsKkkrWkLyB8JmJG5VgD8T7EQ4WewH5A. Rules for 2024–2026 came from Wayback Machine snapshots of the same page. - ERC 2026 rules and appendices: https://roverchallenge.eu/onsite2026files (Google Drive folder "01_RULES"). - ERC background: [EPFL Xplore wins ERC 2025](https://actu.epfl.ch/news/epfl-xplore-wins-first-place-at-the-2025-european-), [ERC general changes page](https://roverchallenge.eu/?p=9126), [EPFL Xplore ERC 2025 page](https://epflxplore.github.io/Website/projects/european-rover-challenge/years/Phoenyx).